<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1027320325060294&amp;ev=PageView&amp;noscript=1">

Clover Meadows Solar

Under Construction

📍 Claverack, NY

  • 13,338 Solar Panels
  • 10,118,448 kWh Annual Generation
  •  7,269 kW DC

⏳ Expected completion date: Spring 2025

  • Savings-Piggy-Bank

    30 Year Savings

    $3,444,365
  • Green-Home

    Homes Powered

    1,396
  • CO2

    Annual Co2 Reduction (lbs)

    15,808,833
  • Car-Cloud

    Cars Removed from Road

    1,594

All Greenhouse Gas Equivalencies are based on the EPA Greenhouse Gas Equivalencies Calculator.